Gaplad › Free tools & guides › Sample sensor data

Free datasets · CC0

Sample sensor data with gaps, and the answer key.

Realistic logger records with the problems real loggers have: dropouts, outages where everything dies at once, error codes, spikes, frozen sensors and re-installed transducers. Each one comes with a list of exactly what was planted where, so you can check any gap-filling or QC method against it, including ours.

All five are synthetic, generated by a fixed recipe; no real station's data is published here. Free to use for anything (CC0). Every file is small enough for Gaplad's free tier.

Weather station, hourly (6 months)

Air temperature, humidity and wind with random dropouts, a 5-day outage, -9999 codes, spikes and a frozen anemometer.

1 hour · April to September 2025, 4,392 rows

Columns

What is wrong with it (the answer key)

Download CSV Fill it in Gaplad QC check it List its gaps

Related: Weather station data

River stage and rainfall, 15-minute (60 days)

Stage responding to five storms, a 3-day telemetry dropout, short gaps and a transducer re-installed 25 cm lower.

15 minutes · October to November 2025, 5,760 rows

Columns

What is wrong with it (the answer key)

Download CSV Fill it in Gaplad QC check it List its gaps

Related: Streamflow and stage

Groundwater level and barometric pressure, hourly (1 year)

A slow seasonal well record with a barometric response, a 23-day gap from a late download visit and a few spikes.

1 hour · July 2024 to June 2025, 8,760 rows

Columns

What is wrong with it (the answer key)

Download CSV Fill it in Gaplad QC check it List its gaps

Related: Groundwater levels

Soil moisture at three depths, 30-minute (120 days)

Volumetric water content at 10, 30 and 60 cm with rain, a 9-day probe outage and a frozen deep probe.

30 minutes · May to August 2025, 5,760 rows

Columns

What is wrong with it (the answer key)

Download CSV Fill it in Gaplad QC check it List its gaps

Related: Soil moisture

Solar PV, daytime-only logging, hourly (60 days)

PV power and irradiance that are blank every night by design, plus a real 4-day inverter outage.

1 hour · June to July 2025, 1,440 rows

Columns

What is wrong with it (the answer key)

Download CSV Fill it in Gaplad QC check it List its gaps

Related: Any sensor time series

Using them

Have your own record?

Drop it into Gaplad. The free tier runs the whole pipeline (QC, validation, fill, trust report) on up to 20,000 time steps.

Open Gaplad, free How to choose a method